dc.contributor.author |
Bhoi, B. |
|
dc.contributor.author |
Mishra, C.R. |
|
dc.contributor.author |
Mishra, H.P. |
|
dc.contributor.editor |
Hwang, J. |
|
dc.contributor.editor |
Drelich, J. |
|
dc.contributor.editor |
Downey, J. |
|
dc.contributor.editor |
Jiang, T. |
|
dc.contributor.editor |
Cooksey, M. |
|
dc.date.accessioned |
2018-10-01T12:24:51Z |
|
dc.date.available |
2018-10-01T12:24:51Z |
|
dc.date.issued |
2011 |
|
dc.identifier.citation |
2nd International Symposium On High-Temperature Metallurgical Processing, 2011: 363-370 |
|
dc.identifier.isbn |
978-1-11802-938-1 |
|
dc.identifier.uri |
http://ore.immt.res.in/handle/2018/1669 |
|
dc.description.abstract |
the Sukinda Valley of Orissa, India, the total quantity of nickel ore reserves comprising of both lateritic and chromite over burden(COB) have been estimated at around 231 million tonnes containing 0.3 to 0.9% Ni. While mining of one tonne of Chromite ore, around 6-7 tonnes of chromite over burden are removed. These overburden materials are disposed as waste materials, which causes lot of environmental hazards and ecological imbalance. India imports a large amount of nickel and ferro-nickel to meet its growing demands in various sectors. For import substitutions, efforts have been made to produced ferro-nickel from the lean deposits of nickel bearing lateritic ores/ chromite over burden materials by reduction roasting followed by magnetic separation and then the nickel rich magnetic fraction is smelted to produce ferro-nickel. It has been possible to produce ferro-nickel of grade varying from 4-25% nickel. |
|
dc.language |
en |
|
dc.publisher |
Wiley |
|
dc.relation.isbasedon |
2nd International Symposium on High-Temperature Metallurgical Processing held during the TMS 140th Annual Meeting & Exhibition., San Diego, USA; FEB 27-MAR 03, 2011 |
|
dc.relation.isreferencedby |
SCI |
|
dc.rights |
Copyright [2011]. All efforts have been made to respect the copyright to the best of our knowledge. Inadvertent omissions, if brought to our notice, stand for correction and withdrawal of document from this repository. |
|
dc.subject |
Materials Sciences |
|
dc.subject |
Materials Sciences |
|
dc.title |
WASTE TO WEALTH: PRODUCTION OF Fe-Ni FROM LATERITIC ORE/CHROMITE OVERBURDEN OF SUKINDA DEPOSIT IN ORISSA, INDIA |
|
dc.type |
Proceedings Paper |
|
dc.affiliation.author |
CSIR-IMMT, Bhubaneswar 751013, Odisha, India |
|